Cloud Knowledge

Your Go-To Hub for Cloud Solutions & Insights

Advertisement

Migrating Virtual Machines (VMs) from GCP to Azure using Azure Migrate

Migrating Virtual Machines (VMs) from GCP to Azure using Azure Migrate
Cloud migration illustration
Cloud migration from GCP to Azure

Complete Guide: Migrating Virtual Machines (VMs) from GCP to Azure using Azure Migrate

Moving workloads across cloud providers is no trivial task. In this comprehensive guide, we’ll walk you through how to migrate virtual machines (VMs) from **Google Cloud Platform (GCP)** to **Microsoft Azure** using **Azure Migrate**. We’ll cover prerequisites, detailed steps (for Windows, Linux, server VMs), data/HDD handling, limitations, pitfalls, and best practices.

Why Migrate from GCP to Azure?

Linux / Unix VMs (Note: Because of HTML conflicts, GPT autoproduced “”. Replace with `

Linux / Unix VMs

` in your editor.)

Linux VMs have their own nuances:

  • Ensure the Mobility agent supports your Linux distro (Ubuntu, CentOS, RedHat, SUSE, Debian, etc.).
  • You may have to reconfigure the network (e.g. udev rules, network interface names) if Azure NIC naming differs.
  • Check for custom kernel modules or drivers that may not be supported in Azure. Adjust or remove unsupported modules.
  • After migration, run `grub`, `fstab`, or bootloader fixes if needed. For example if root disk device name changes.
  • For databases, ensure file flush, no pending writes, and test I/O performance under the new disk environment.

Legacy / Specialized Server OS (e.g. bespoke, cluster, appliances)

Some server OS or appliance-type VMs may not be directly supported. In such cases:

  • Consider exporting disk images (VHD, VMDK, raw) and importing them manually into Azure (e.g. via Azure Storage / Azure Blob and then VM creation).
  • Use **VM conversion tools** (e.g. qemu-img, Azure conversion tool) to convert unsupported disk formats.
  • Verify driver compatibility and network stack after import.
  • For clustered or highly available setups, migrate and validate in sequence (e.g. primary first, then replicas).

Handling Data, Disks, and Storage During Migration

One of the trickiest parts of migration is how to move disks, persistent volumes, and data consistency. Here’s what you should know and plan for.

Disk Types & Formats

GCP VMs use **Persistent Disks**, which may be Standard HDD, Standard SSD, or Balanced / PD-SSD. These are presented to the VM at `/dev/disk/by-id/…` or as `/dev/sdX` etc. In Azure, VMs typically use **Managed Disks** (Standard HDD, Standard SSD, Premium SSD, Ultra SSD) or **Unmanaged Disks** in storage accounts.

During replication, the agent captures the logical blocks from the GCP disk and recreates them on Azure managed disks or equivalent. The disk file system (NTFS, ext4, xfs) remains intact unless you convert or re-format.

Incremental / Block-level Replication

Because full copy of large disks is time-consuming, the replication uses **incremental changes** — only the blocks changed since the last sync are transferred. This reduces bandwidth, time, and lag. :contentReference[oaicite:10]{index=10}

Note: If a disk is heavily used, or has hotspots, the initial sync may take long, and catching up changes may lag if network is constrained.

Data Consistency & Quiescing Writes

To ensure consistency:

  • Stop or quiesce applications or services (e.g. databases, file servers) before final replication. Flush writes to disk.
  • During test / final cutover, minimize or pause I/O changes.
  • Validate checksums, database integrity, and application state post-migration.

For certain workloads (e.g. database clusters), you may consider additional steps like snapshotting, replication, or logical replication (e.g. DB-level replication) in parallel with VM migration.

Swap / Resize / Optimize Disks Post-migration

After migration completes:

  • Review disk sizing — some disks may be oversized; you may shrink (if supported) or consolidate volumes.
  • Move frequently accessed volumes to higher performance tier (Premium / Ultra disks) if needed.
  • Delete unused staging or replica disks created for migration.
  • Enable Azure backup or snapshot policies on the new disks.

Limitations, Challenges & Pitfalls to Watch Out For

No migration is perfect — here are known limitations or gotchas you must anticipate.

  • **Unsupported OS / VM types:** Some niche OS versions or custom kernels might not work with Azure Migrate’s agents.
  • **Large disks / high I/O:** Moving very large disks (multi-TB) or VMs with heavy I/O may take very long or cause lag in incremental replication.
  • **Network bandwidth / latency constraints:** If replication is over WAN, slow network can bottleneck. Consider express routes or staged transfer.
  • **IP / DNS change impacts:** If your GCP VM had internal IPs or DNS, re-mapping in Azure may break internal dependencies unless carefully handled.
  • **Licensing / compliance concerns:** Windows licensing, SQL Server licensing, or other licensed components need careful handling. Bring-your-own-license eligibility may vary.
  • **Disk format / partition differences:** If GCP disks had unusual partition layout or multiple OS partitions, boot sectors, etc., you may need repair after migration.
  • **Stateful workloads / latency-sensitive services:** Some services cannot tolerate even small downtime — you may need hybrid or live replication strategies or staged migration.
  • **Inter-VM dependencies:** Applications spread across multiple VMs with tight coupling need sequencing to avoid breakage during cutover.
  • **Cost surprises:** Replication storage, egress bandwidth, Azure managed disk costs, staging VMs, and potential idle VMs can add costs — plan and budget accordingly.
  • **Agent or service failures:** Agents might fail registration or replication; monitor health and alerts carefully.

By being aware of these and doing pilot tests, you can reduce surprises.

Walkthrough: Migration Example (Windows & Linux) from GCP → Azure

Below is a hypothetical but practical migration scenario for both Windows and Linux VMs, tying together the above steps (you’ll want to adapt to your environment). Use this as a reference blueprint.

Scenario: Web + Database VMs

Assume you have two VMs in GCP:

  • **web-gcp** (Windows Server 2019, IIS, static content)
  • **db-gcp** (Linux Ubuntu 22.04 running MySQL)
  • They are in same VPC, web-vm talks to db-vm internally over private IP.

Your goal: replicate both VMs to Azure, spin them up, and cut over with minimal downtime.

Step-by-step (applied)

  1. **Assessment** Deploy Azure Migrate collector, discover both VMs, collect performance data, map dependencies (web ↔ db). The assessment report shows web VM underutilized in CPU, db VM disk heavy I/O.
  2. **Prepare Azure** Create a resource group (e.g. RG-WebDB), a virtual network with two subnets (web-subnet, db-subnet), NSGs, routing, connectivity to your on-prem or office.
  3. **Install agents** On web-gcp (Windows), install Mobility agent via the Azure Migrate > replicate wizard. On db-gcp (Ubuntu), install the Linux Mobility agent (via downloaded package).
  4. **Initial replication** The agent copies full disks (C: for web-gcp, / and /var or data volumes for db-gcp) to Azure staging disks. Ongoing incremental replication start.
  5. **Test migration** Use “Test migrate” in Azure Migrate for both VMs. This spin up test-web and test-db in Azure (detached from production). Validate web UI, database connectivity, query performance, etc.
  6. **Cutover** Shut down web-gcp & db-gcp (or quiesce traffic), perform final replication. Initiate cutover in Azure Migrate, assign the proper private IPs, DNS entries, validate communication web → db. Start Azure web VM, Azure db VM, test full app stack.
  7. **Cleanup / optimize** Remove replication agents, delete staging disks, resize disk tiers, enable backup policies, monitor performance. Decommission old GCP VMs when confident.

This template can be expanded to dozens of VMs or more complex topologies.

Tips, Best Practices & Optimization Strategies

  • **Start small** — pick a low-risk VM first as pilot to validate steps.
  • **Batch migrations** by application domain or dependency groups to avoid blast radius.
  • **Monitor replication health** and set alerts on failures, lag, agent disconnects.
  • **Use high-bandwidth links or VPN/ExpressRoute** to speed replication if VMs or disks are large.
  • **Pre-warm target disks** in Azure to avoid cold IOPS latencies post-migration.
  • **Resize disks / VMs after cutover**, don't just copy original size — rightsize based on performance insights. The assessment report helps.
  • **Enable Azure Backup / Azure Site Recovery** post-migration for DR and retention strategies.
  • **Run sanity checks and application tests** after cutover, including dependencies, latency, logs, performance, user-facing functionality.
  • **Document IP / DNS re-mappings** and plan rollback or fallback in case issues arise.
  • **Ensure logging, monitoring, alerting** are enabled in Azure (Azure Monitor, Log Analytics, etc.).

Comparisons & Alternatives (When Azure Migrate Doesn’t Fit)

While Azure Migrate is the recommended tool, there are scenarios where alternate approaches might be needed:

  • **Manual VM import/export** — export GCP VM disk image (as VMDK or raw), upload to Azure Blob, then create VM from image. This gives more control but is more manual and error-prone.
  • **Third-party migration tools** — e.g. CloudEndure (AWS), Zerto, rSync, or commercial migration platforms that support multi-cloud replication.
  • **Rebuild & replatform** — for some workloads, re-deploying fresh VMs or using PaaS services on Azure may make more sense than lifting and shifting entire VMs.
  • **Hybrid or split architecture** — keep some services in GCP while migrating core ones to Azure initially, then gradually migrate rest.

Evaluate based on your environment, risk tolerance, downtime windows, and complexity.

SEO & Discovery Optimization Tips (for Edge News / Google Discover / Bing)

To help this post perform better in Edge News / Discover / Bing, follow these best practices:

  • Use a **clear, descriptive title** with target keywords (e.g. “Migrate VMs from GCP to Azure using Azure Migrate”).
  • Include a concise **meta description** (120-160 chars) summarizing the value (this helps discover card snippet).
  • Use proper headings (H1, H2, H3) with keywords (e.g. “GCP to Azure VM migration”, “Azure Migrate steps”).
  • Include **alt text** for images with keywords (e.g. “GCP VM migration diagram”).
  • Break paragraphs into short, digestible sentences for readability on mobile.
  • Include **internal links** (if you have other relevant posts) and **external authoritative links** (e.g. to Microsoft docs). For example: “See Microsoft’s tutorial: Discover, assess, and migrate GCP VMs to Azure.” :contentReference[oaicite:11]{index=11}
  • Use **structured data / schema markup** if your WordPress theme supports it (e.g. article schema). This helps Bing / Discover show rich cards.
  • Use **lazy loading** for images, and proper **srcset / sizes** attributes for responsiveness (as shown in the image block above).
  • Promote and share on social, tech communities (e.g. Azure, GCP forums) to drive engagement signals.

Final Checklist Before You Hit Migrate

  • Have you taken backups / snapshots of all VMs?
  • Is your assessment report clean (no major blocking issues)?
  • Is Azure environment fully provisioned (network, storage, IAM)?
  • Are replication agents healthy and data syncing?
  • Have you validated test migrations?
  • Are DNS / IP cutover plans documented?
  • Have you allocated time for post-migration validation?
  • Do you have rollback or fallback plans?

Once you’ve verified all of these, you’re ready to execute the migration with confidence.

Conclusion

Migrating virtual machines from GCP to Azure is a complex but manageable process when planned thoughtfully. Using Azure Migrate (with its assessment, replication, cutover, and validation capabilities) gives you a structured, reliable path. The key is to validate early and often, mitigate risks, and keep operations lean.

With this guide, you now have a blueprint to migrate Windows or Linux VMs, manage disk/data replication, handle limitations, and optimize post-migration. You can adapt the steps to your environment, scale to multiple VMs, and refine as you go.

Good luck with your migration — and if you need help in any step (e.g. scripting, diagnostics, rollback strategies), feel free to ask!

Before you migrate, you need insight into your GCP VMs — their CPU, memory, disk usage, performance, dependencies, and whether they’re good candidates for Azure. Azure Migrate provides a “Discovery & Assessment” stage. :contentReference[oaicite:5]{index=5}

  • In Azure Migrate portal, select **Server Assessment** and create a new assessment project.
  • Deploy the Azure Migrate collector appliance (VM) in your network (either in GCP or a hybrid environment) that will collect metadata and performance data from GCP VMs.
  • Register VMs into the assessment via credentials or agent. For Linux, use SSH or a supported agent; for Windows, use credentials or agent.
  • Run discovery / inventory. Allow a few hours for collection of performance data (depends on number of VMs).
  • Generate an assessment report. The report will show right-sizing suggestions, cost estimates, compatibility issues, and dependencies. :contentReference[oaicite:6]{index=6}
  • Use the dependencies map (if available) to see which VMs communicate, which helps in sequencing cutover. This avoids breaking interdependent systems.

2. Prepare Target Azure Environment

  • Create or confirm the appropriate Azure resource group and virtual network environment that mirrors or complements your GCP setup.
  • Ensure subnets, NSGs, routing, connectivity (VPN, ExpressRoute) are in place.
  • Decide on storage type (Premium, Standard SSD/HDD) for disks. Pre-create storage accounts or managed disks as needed.
  • Set up any identity, domain join, or DNS settings for Azure environment.
  • Ensure the Azure Migrate project has network access to your replication appliance or agents.

3. Deploy Replication / Migration Appliance / Agents

To replicate VM data from GCP to Azure, you need either an appliance (in more complex network scenarios) or direct agent-based replication on the VMs. Azure Migrate supports agent-based replication for many VMs. :contentReference[oaicite:7]{index=7}

  • In Azure Migrate > Server Migration, choose “Add Tools” and then select **Replicate** option.
  • Download and install the **Mobility agent** on each GCP VM you plan to migrate (both Windows and Linux). This agent captures disk I/O changes and replications. :contentReference[oaicite:8]{index=8}
  • If needed, deploy a replication appliance (e.g. configuration server) in GCP or on a jump host to coordinate replication.
  • Ensure connectivity (firewalls, ports) is open between the agent/appliance and Azure endpoints.
  • Validate agent registration and health in Azure Migrate console.

4. Start Replication of VM Disks / Data

Once agents are in place, begin replication of disks. This has two main phases:

  • Initial synchronization (full copy): The agent copies the full content of each disk to Azure (or an intermediate staging area). This can take time depending on disk sizes and network speed.
  • Incremental replication: After initial sync, only changed blocks are replicated periodically (hourly or as configured). This keeps the target close to source state. :contentReference[oaicite:9]{index=9}

The replication status will show “Initial sync”, “Ongoing replication”, or “Ready for cutover” in the Azure Migrate console.

5. Perform Test Migration / Test Cutover

Before fully switching over, you want to validate that VMs work correctly on Azure:

  • In Azure Migrate, choose **Test migration** (a “test cutover” option). This spins up a “test” VM in Azure from the latest replicated snapshot/disks.
  • Test connectivity, applications, services, database integrity, network configuration, and performance.
  • If issues arise (e.g. drivers, network adapters, OS errors), fix them in test environment, then roll back and re-migrate.
  • Once test is validated, you’re ready for final cutover.

6. Cutover / Final Migration

To move into production, you run the final migration steps:

  • Stop services or shut down the source GCP VM to prevent further changes (quiesce writes).
  • Perform a final replication to sync residual changes.
  • In Azure Migrate, choose **Migrate / Cutover** to finalize the VM in Azure.
  • Assign public IP / internal IP, configure DNS, network routes, load balancers, etc.
  • Power on the Azure VM.
  • Validate everything is working as expected (services, connectivity, application behavior).

7. Post-Migration: Cleanup & Optimization

  • Disable and remove replication / mobility agents in Azure Migrate so they don’t incur overhead or cost.
  • Delete staging resources like replication storage accounts, intermediate disks that are no longer needed.
  • Resize VMs and disks based on actual usage, not just the original size.
  • Set up backups / snapshots / DR plans in Azure.
  • Monitor performance and tune resource allocation (CPU, memory, IOPS).
  • Decommission the old GCP VMs once you’re confident in the Azure environment.

Differences & Special Cases: Windows vs Linux vs Server OS

Windows VMs

Windows VMs typically require attention to boot drivers, networking adapters, and license compliance:

  • Ensure the Mobility agent supports your Windows version (Server 2012, 2016, 2019, 2022 etc.).
  • After migration, adjust network adapter settings (e.g. switch from legacy to synthetic NIC if needed in Azure).
  • Deal with licensing: if you have Windows Server licenses with Software Assurance, you may bring your license. Otherwise, you’ll use Azure’s Windows licensing (pay-as-you-go). Ensure license compliances.
  • Run **sysprep / generalization** if needed (less often in lift-and-shift). But usually agent-based migration doesn’t require full sysprep for Windows servers.
  • Validate domain join, Active Directory, and security policies post-migration.
Linux / Unix VMs (Note: Because of HTML conflicts, GPT autoproduced “”. Replace with `

Linux / Unix VMs

` in your editor.)

Linux VMs have their own nuances:

  • Ensure the Mobility agent supports your Linux distro (Ubuntu, CentOS, RedHat, SUSE, Debian, etc.).
  • You may have to reconfigure the network (e.g. udev rules, network interface names) if Azure NIC naming differs.
  • Check for custom kernel modules or drivers that may not be supported in Azure. Adjust or remove unsupported modules.
  • After migration, run `grub`, `fstab`, or bootloader fixes if needed. For example if root disk device name changes.
  • For databases, ensure file flush, no pending writes, and test I/O performance under the new disk environment.

Legacy / Specialized Server OS (e.g. bespoke, cluster, appliances)

Some server OS or appliance-type VMs may not be directly supported. In such cases:

  • Consider exporting disk images (VHD, VMDK, raw) and importing them manually into Azure (e.g. via Azure Storage / Azure Blob and then VM creation).
  • Use **VM conversion tools** (e.g. qemu-img, Azure conversion tool) to convert unsupported disk formats.
  • Verify driver compatibility and network stack after import.
  • For clustered or highly available setups, migrate and validate in sequence (e.g. primary first, then replicas).

Handling Data, Disks, and Storage During Migration

One of the trickiest parts of migration is how to move disks, persistent volumes, and data consistency. Here’s what you should know and plan for.

Disk Types & Formats

GCP VMs use **Persistent Disks**, which may be Standard HDD, Standard SSD, or Balanced / PD-SSD. These are presented to the VM at `/dev/disk/by-id/…` or as `/dev/sdX` etc. In Azure, VMs typically use **Managed Disks** (Standard HDD, Standard SSD, Premium SSD, Ultra SSD) or **Unmanaged Disks** in storage accounts.

During replication, the agent captures the logical blocks from the GCP disk and recreates them on Azure managed disks or equivalent. The disk file system (NTFS, ext4, xfs) remains intact unless you convert or re-format.

Incremental / Block-level Replication

Because full copy of large disks is time-consuming, the replication uses **incremental changes** — only the blocks changed since the last sync are transferred. This reduces bandwidth, time, and lag. :contentReference[oaicite:10]{index=10}

Note: If a disk is heavily used, or has hotspots, the initial sync may take long, and catching up changes may lag if network is constrained.

Data Consistency & Quiescing Writes

To ensure consistency:

  • Stop or quiesce applications or services (e.g. databases, file servers) before final replication. Flush writes to disk.
  • During test / final cutover, minimize or pause I/O changes.
  • Validate checksums, database integrity, and application state post-migration.

For certain workloads (e.g. database clusters), you may consider additional steps like snapshotting, replication, or logical replication (e.g. DB-level replication) in parallel with VM migration.

Swap / Resize / Optimize Disks Post-migration

After migration completes:

  • Review disk sizing — some disks may be oversized; you may shrink (if supported) or consolidate volumes.
  • Move frequently accessed volumes to higher performance tier (Premium / Ultra disks) if needed.
  • Delete unused staging or replica disks created for migration.
  • Enable Azure backup or snapshot policies on the new disks.

Limitations, Challenges & Pitfalls to Watch Out For

No migration is perfect — here are known limitations or gotchas you must anticipate.

  • **Unsupported OS / VM types:** Some niche OS versions or custom kernels might not work with Azure Migrate’s agents.
  • **Large disks / high I/O:** Moving very large disks (multi-TB) or VMs with heavy I/O may take very long or cause lag in incremental replication.
  • **Network bandwidth / latency constraints:** If replication is over WAN, slow network can bottleneck. Consider express routes or staged transfer.
  • **IP / DNS change impacts:** If your GCP VM had internal IPs or DNS, re-mapping in Azure may break internal dependencies unless carefully handled.
  • **Licensing / compliance concerns:** Windows licensing, SQL Server licensing, or other licensed components need careful handling. Bring-your-own-license eligibility may vary.
  • **Disk format / partition differences:** If GCP disks had unusual partition layout or multiple OS partitions, boot sectors, etc., you may need repair after migration.
  • **Stateful workloads / latency-sensitive services:** Some services cannot tolerate even small downtime — you may need hybrid or live replication strategies or staged migration.
  • **Inter-VM dependencies:** Applications spread across multiple VMs with tight coupling need sequencing to avoid breakage during cutover.
  • **Cost surprises:** Replication storage, egress bandwidth, Azure managed disk costs, staging VMs, and potential idle VMs can add costs — plan and budget accordingly.
  • **Agent or service failures:** Agents might fail registration or replication; monitor health and alerts carefully.

By being aware of these and doing pilot tests, you can reduce surprises.

Walkthrough: Migration Example (Windows & Linux) from GCP → Azure

Below is a hypothetical but practical migration scenario for both Windows and Linux VMs, tying together the above steps (you’ll want to adapt to your environment). Use this as a reference blueprint.

Scenario: Web + Database VMs

Assume you have two VMs in GCP:

  • **web-gcp** (Windows Server 2019, IIS, static content)
  • **db-gcp** (Linux Ubuntu 22.04 running MySQL)
  • They are in same VPC, web-vm talks to db-vm internally over private IP.

Your goal: replicate both VMs to Azure, spin them up, and cut over with minimal downtime.

Step-by-step (applied)

  1. **Assessment** Deploy Azure Migrate collector, discover both VMs, collect performance data, map dependencies (web ↔ db). The assessment report shows web VM underutilized in CPU, db VM disk heavy I/O.
  2. **Prepare Azure** Create a resource group (e.g. RG-WebDB), a virtual network with two subnets (web-subnet, db-subnet), NSGs, routing, connectivity to your on-prem or office.
  3. **Install agents** On web-gcp (Windows), install Mobility agent via the Azure Migrate > replicate wizard. On db-gcp (Ubuntu), install the Linux Mobility agent (via downloaded package).
  4. **Initial replication** The agent copies full disks (C: for web-gcp, / and /var or data volumes for db-gcp) to Azure staging disks. Ongoing incremental replication start.
  5. **Test migration** Use “Test migrate” in Azure Migrate for both VMs. This spin up test-web and test-db in Azure (detached from production). Validate web UI, database connectivity, query performance, etc.
  6. **Cutover** Shut down web-gcp & db-gcp (or quiesce traffic), perform final replication. Initiate cutover in Azure Migrate, assign the proper private IPs, DNS entries, validate communication web → db. Start Azure web VM, Azure db VM, test full app stack.
  7. **Cleanup / optimize** Remove replication agents, delete staging disks, resize disk tiers, enable backup policies, monitor performance. Decommission old GCP VMs when confident.

This template can be expanded to dozens of VMs or more complex topologies.

Tips, Best Practices & Optimization Strategies

  • **Start small** — pick a low-risk VM first as pilot to validate steps.
  • **Batch migrations** by application domain or dependency groups to avoid blast radius.
  • **Monitor replication health** and set alerts on failures, lag, agent disconnects.
  • **Use high-bandwidth links or VPN/ExpressRoute** to speed replication if VMs or disks are large.
  • **Pre-warm target disks** in Azure to avoid cold IOPS latencies post-migration.
  • **Resize disks / VMs after cutover**, don't just copy original size — rightsize based on performance insights. The assessment report helps.
  • **Enable Azure Backup / Azure Site Recovery** post-migration for DR and retention strategies.
  • **Run sanity checks and application tests** after cutover, including dependencies, latency, logs, performance, user-facing functionality.
  • **Document IP / DNS re-mappings** and plan rollback or fallback in case issues arise.
  • **Ensure logging, monitoring, alerting** are enabled in Azure (Azure Monitor, Log Analytics, etc.).

Comparisons & Alternatives (When Azure Migrate Doesn’t Fit)

While Azure Migrate is the recommended tool, there are scenarios where alternate approaches might be needed:

  • **Manual VM import/export** — export GCP VM disk image (as VMDK or raw), upload to Azure Blob, then create VM from image. This gives more control but is more manual and error-prone.
  • **Third-party migration tools** — e.g. CloudEndure (AWS), Zerto, rSync, or commercial migration platforms that support multi-cloud replication.
  • **Rebuild & replatform** — for some workloads, re-deploying fresh VMs or using PaaS services on Azure may make more sense than lifting and shifting entire VMs.
  • **Hybrid or split architecture** — keep some services in GCP while migrating core ones to Azure initially, then gradually migrate rest.

Evaluate based on your environment, risk tolerance, downtime windows, and complexity.

SEO & Discovery Optimization Tips (for Edge News / Google Discover / Bing)

To help this post perform better in Edge News / Discover / Bing, follow these best practices:

  • Use a **clear, descriptive title** with target keywords (e.g. “Migrate VMs from GCP to Azure using Azure Migrate”).
  • Include a concise **meta description** (120-160 chars) summarizing the value (this helps discover card snippet).
  • Use proper headings (H1, H2, H3) with keywords (e.g. “GCP to Azure VM migration”, “Azure Migrate steps”).
  • Include **alt text** for images with keywords (e.g. “GCP VM migration diagram”).
  • Break paragraphs into short, digestible sentences for readability on mobile.
  • Include **internal links** (if you have other relevant posts) and **external authoritative links** (e.g. to Microsoft docs). For example: “See Microsoft’s tutorial: Discover, assess, and migrate GCP VMs to Azure.” :contentReference[oaicite:11]{index=11}
  • Use **structured data / schema markup** if your WordPress theme supports it (e.g. article schema). This helps Bing / Discover show rich cards.
  • Use **lazy loading** for images, and proper **srcset / sizes** attributes for responsiveness (as shown in the image block above).
  • Promote and share on social, tech communities (e.g. Azure, GCP forums) to drive engagement signals.

Final Checklist Before You Hit Migrate

  • Have you taken backups / snapshots of all VMs?
  • Is your assessment report clean (no major blocking issues)?
  • Is Azure environment fully provisioned (network, storage, IAM)?
  • Are replication agents healthy and data syncing?
  • Have you validated test migrations?
  • Are DNS / IP cutover plans documented?
  • Have you allocated time for post-migration validation?
  • Do you have rollback or fallback plans?

Once you’ve verified all of these, you’re ready to execute the migration with confidence.

Conclusion

Migrating virtual machines from GCP to Azure is a complex but manageable process when planned thoughtfully. Using Azure Migrate (with its assessment, replication, cutover, and validation capabilities) gives you a structured, reliable path. The key is to validate early and often, mitigate risks, and keep operations lean.

With this guide, you now have a blueprint to migrate Windows or Linux VMs, manage disk/data replication, handle limitations, and optimize post-migration. You can adapt the steps to your environment, scale to multiple VMs, and refine as you go.

Good luck with your migration — and if you need help in any step (e.g. scripting, diagnostics, rollback strategies), feel free to ask!

At a broad level, the migration path is:

  • **Assess & discover**: Bring GCP VMs metadata, performance metrics, dependency mapping into Azure Migrate
  • **Prepare Azure environment**: Set up target networking, resource groups, permissions, etc.
  • **Replicate / migrate**: Use agent-based or appliance-based replication to copy VM disks/data to Azure
  • **Test / validate (test cutover)**: Spin up test VMs in Azure to validate functionality
  • **Cutover / final migration**: Bring down source VM, finalize replication, switch DNS / IPs / services to Azure
  • **Post-migration cleanup & optimization**: Decommission replication, resize, optimize, enable backups, monitor

In the next sections, we’ll dive deep into each of these phases.

Prerequisites & Prechecks

GCP Side Requirements

  • Your GCP project(s) must permit installation of agents or network access to Azure endpoints.
  • Open firewall and allow outbound replication traffic to Azure (typically TCP, specific ports, see Azure Migrate docs).
  • Ensure VMs are powered (or even offline, depending on approach) and reachable. For Linux, SSH; for Windows, RDP; agent installation must succeed.
  • Check OS compatibility (Windows versions, Linux distros) to be supported by Azure Migrate’s replication agents. :contentReference[oaicite:2]{index=2}
  • Ensure you have sufficient IAM permissions in GCP to install agents, read disk volumes, snapshot, etc.
  • Take backups or snapshots — always have fallback in case something goes wrong.

Azure Side Requirements

  • An active Azure subscription, with suitable quota for VMs, disks, network, etc.
  • Create or designate a **Resource Group**, **Virtual Network (VNet)**, **Subnets**, **NSGs**, **Public IPs**, **Network Peering or VPN / ExpressRoute** if needed.
  • Ensure you have **Contributor / Owner** permissions (or specific resource permissions) to create VMs, storage accounts, NICs, etc.
  • Enable and register the Azure Migrate resource provider (Microsoft.Migrate). Also enable subscription-level features needed. :contentReference[oaicite:3]{index=3}
  • Create **Azure Migrate: Server Assessment + Server Migration** projects in the Azure Migrate hub. :contentReference[oaicite:4]{index=4}
  • Ensure azure region, resources, and network are properly set up to host the migrated VMs.
  • Plan for storage — either managed disks or storage accounts in Azure — sufficient IOPS, throughput, size, and redundancy.

Step-by-Step Migration Process

Below is a detailed, stepwise approach. Use it for both Windows and Linux VMs, adjusting minor differences where needed.

1. Discover & Assess GCP VMs

Before you migrate, you need insight into your GCP VMs — their CPU, memory, disk usage, performance, dependencies, and whether they’re good candidates for Azure. Azure Migrate provides a “Discovery & Assessment” stage. :contentReference[oaicite:5]{index=5}

  • In Azure Migrate portal, select **Server Assessment** and create a new assessment project.
  • Deploy the Azure Migrate collector appliance (VM) in your network (either in GCP or a hybrid environment) that will collect metadata and performance data from GCP VMs.
  • Register VMs into the assessment via credentials or agent. For Linux, use SSH or a supported agent; for Windows, use credentials or agent.
  • Run discovery / inventory. Allow a few hours for collection of performance data (depends on number of VMs).
  • Generate an assessment report. The report will show right-sizing suggestions, cost estimates, compatibility issues, and dependencies. :contentReference[oaicite:6]{index=6}
  • Use the dependencies map (if available) to see which VMs communicate, which helps in sequencing cutover. This avoids breaking interdependent systems.

2. Prepare Target Azure Environment

  • Create or confirm the appropriate Azure resource group and virtual network environment that mirrors or complements your GCP setup.
  • Ensure subnets, NSGs, routing, connectivity (VPN, ExpressRoute) are in place.
  • Decide on storage type (Premium, Standard SSD/HDD) for disks. Pre-create storage accounts or managed disks as needed.
  • Set up any identity, domain join, or DNS settings for Azure environment.
  • Ensure the Azure Migrate project has network access to your replication appliance or agents.

3. Deploy Replication / Migration Appliance / Agents

To replicate VM data from GCP to Azure, you need either an appliance (in more complex network scenarios) or direct agent-based replication on the VMs. Azure Migrate supports agent-based replication for many VMs. :contentReference[oaicite:7]{index=7}

  • In Azure Migrate > Server Migration, choose “Add Tools” and then select **Replicate** option.
  • Download and install the **Mobility agent** on each GCP VM you plan to migrate (both Windows and Linux). This agent captures disk I/O changes and replications. :contentReference[oaicite:8]{index=8}
  • If needed, deploy a replication appliance (e.g. configuration server) in GCP or on a jump host to coordinate replication.
  • Ensure connectivity (firewalls, ports) is open between the agent/appliance and Azure endpoints.
  • Validate agent registration and health in Azure Migrate console.

4. Start Replication of VM Disks / Data

Once agents are in place, begin replication of disks. This has two main phases:

  • Initial synchronization (full copy): The agent copies the full content of each disk to Azure (or an intermediate staging area). This can take time depending on disk sizes and network speed.
  • Incremental replication: After initial sync, only changed blocks are replicated periodically (hourly or as configured). This keeps the target close to source state. :contentReference[oaicite:9]{index=9}

The replication status will show “Initial sync”, “Ongoing replication”, or “Ready for cutover” in the Azure Migrate console.

5. Perform Test Migration / Test Cutover

Before fully switching over, you want to validate that VMs work correctly on Azure:

  • In Azure Migrate, choose **Test migration** (a “test cutover” option). This spins up a “test” VM in Azure from the latest replicated snapshot/disks.
  • Test connectivity, applications, services, database integrity, network configuration, and performance.
  • If issues arise (e.g. drivers, network adapters, OS errors), fix them in test environment, then roll back and re-migrate.
  • Once test is validated, you’re ready for final cutover.

6. Cutover / Final Migration

To move into production, you run the final migration steps:

  • Stop services or shut down the source GCP VM to prevent further changes (quiesce writes).
  • Perform a final replication to sync residual changes.
  • In Azure Migrate, choose **Migrate / Cutover** to finalize the VM in Azure.
  • Assign public IP / internal IP, configure DNS, network routes, load balancers, etc.
  • Power on the Azure VM.
  • Validate everything is working as expected (services, connectivity, application behavior).

7. Post-Migration: Cleanup & Optimization

  • Disable and remove replication / mobility agents in Azure Migrate so they don’t incur overhead or cost.
  • Delete staging resources like replication storage accounts, intermediate disks that are no longer needed.
  • Resize VMs and disks based on actual usage, not just the original size.
  • Set up backups / snapshots / DR plans in Azure.
  • Monitor performance and tune resource allocation (CPU, memory, IOPS).
  • Decommission the old GCP VMs once you’re confident in the Azure environment.

Differences & Special Cases: Windows vs Linux vs Server OS

Windows VMs

Windows VMs typically require attention to boot drivers, networking adapters, and license compliance:

  • Ensure the Mobility agent supports your Windows version (Server 2012, 2016, 2019, 2022 etc.).
  • After migration, adjust network adapter settings (e.g. switch from legacy to synthetic NIC if needed in Azure).
  • Deal with licensing: if you have Windows Server licenses with Software Assurance, you may bring your license. Otherwise, you’ll use Azure’s Windows licensing (pay-as-you-go). Ensure license compliances.
  • Run **sysprep / generalization** if needed (less often in lift-and-shift). But usually agent-based migration doesn’t require full sysprep for Windows servers.
  • Validate domain join, Active Directory, and security policies post-migration.
Linux / Unix VMs (Note: Because of HTML conflicts, GPT autoproduced “”. Replace with `

Linux / Unix VMs

` in your editor.)

Linux VMs have their own nuances:

  • Ensure the Mobility agent supports your Linux distro (Ubuntu, CentOS, RedHat, SUSE, Debian, etc.).
  • You may have to reconfigure the network (e.g. udev rules, network interface names) if Azure NIC naming differs.
  • Check for custom kernel modules or drivers that may not be supported in Azure. Adjust or remove unsupported modules.
  • After migration, run `grub`, `fstab`, or bootloader fixes if needed. For example if root disk device name changes.
  • For databases, ensure file flush, no pending writes, and test I/O performance under the new disk environment.

Legacy / Specialized Server OS (e.g. bespoke, cluster, appliances)

Some server OS or appliance-type VMs may not be directly supported. In such cases:

  • Consider exporting disk images (VHD, VMDK, raw) and importing them manually into Azure (e.g. via Azure Storage / Azure Blob and then VM creation).
  • Use **VM conversion tools** (e.g. qemu-img, Azure conversion tool) to convert unsupported disk formats.
  • Verify driver compatibility and network stack after import.
  • For clustered or highly available setups, migrate and validate in sequence (e.g. primary first, then replicas).

Handling Data, Disks, and Storage During Migration

One of the trickiest parts of migration is how to move disks, persistent volumes, and data consistency. Here’s what you should know and plan for.

Disk Types & Formats

GCP VMs use **Persistent Disks**, which may be Standard HDD, Standard SSD, or Balanced / PD-SSD. These are presented to the VM at `/dev/disk/by-id/…` or as `/dev/sdX` etc. In Azure, VMs typically use **Managed Disks** (Standard HDD, Standard SSD, Premium SSD, Ultra SSD) or **Unmanaged Disks** in storage accounts.

During replication, the agent captures the logical blocks from the GCP disk and recreates them on Azure managed disks or equivalent. The disk file system (NTFS, ext4, xfs) remains intact unless you convert or re-format.

Incremental / Block-level Replication

Because full copy of large disks is time-consuming, the replication uses **incremental changes** — only the blocks changed since the last sync are transferred. This reduces bandwidth, time, and lag. :contentReference[oaicite:10]{index=10}

Note: If a disk is heavily used, or has hotspots, the initial sync may take long, and catching up changes may lag if network is constrained.

Data Consistency & Quiescing Writes

To ensure consistency:

  • Stop or quiesce applications or services (e.g. databases, file servers) before final replication. Flush writes to disk.
  • During test / final cutover, minimize or pause I/O changes.
  • Validate checksums, database integrity, and application state post-migration.

For certain workloads (e.g. database clusters), you may consider additional steps like snapshotting, replication, or logical replication (e.g. DB-level replication) in parallel with VM migration.

Swap / Resize / Optimize Disks Post-migration

After migration completes:

  • Review disk sizing — some disks may be oversized; you may shrink (if supported) or consolidate volumes.
  • Move frequently accessed volumes to higher performance tier (Premium / Ultra disks) if needed.
  • Delete unused staging or replica disks created for migration.
  • Enable Azure backup or snapshot policies on the new disks.

Limitations, Challenges & Pitfalls to Watch Out For

No migration is perfect — here are known limitations or gotchas you must anticipate.

  • **Unsupported OS / VM types:** Some niche OS versions or custom kernels might not work with Azure Migrate’s agents.
  • **Large disks / high I/O:** Moving very large disks (multi-TB) or VMs with heavy I/O may take very long or cause lag in incremental replication.
  • **Network bandwidth / latency constraints:** If replication is over WAN, slow network can bottleneck. Consider express routes or staged transfer.
  • **IP / DNS change impacts:** If your GCP VM had internal IPs or DNS, re-mapping in Azure may break internal dependencies unless carefully handled.
  • **Licensing / compliance concerns:** Windows licensing, SQL Server licensing, or other licensed components need careful handling. Bring-your-own-license eligibility may vary.
  • **Disk format / partition differences:** If GCP disks had unusual partition layout or multiple OS partitions, boot sectors, etc., you may need repair after migration.
  • **Stateful workloads / latency-sensitive services:** Some services cannot tolerate even small downtime — you may need hybrid or live replication strategies or staged migration.
  • **Inter-VM dependencies:** Applications spread across multiple VMs with tight coupling need sequencing to avoid breakage during cutover.
  • **Cost surprises:** Replication storage, egress bandwidth, Azure managed disk costs, staging VMs, and potential idle VMs can add costs — plan and budget accordingly.
  • **Agent or service failures:** Agents might fail registration or replication; monitor health and alerts carefully.

By being aware of these and doing pilot tests, you can reduce surprises.

Walkthrough: Migration Example (Windows & Linux) from GCP → Azure

Below is a hypothetical but practical migration scenario for both Windows and Linux VMs, tying together the above steps (you’ll want to adapt to your environment). Use this as a reference blueprint.

Scenario: Web + Database VMs

Assume you have two VMs in GCP:

  • **web-gcp** (Windows Server 2019, IIS, static content)
  • **db-gcp** (Linux Ubuntu 22.04 running MySQL)
  • They are in same VPC, web-vm talks to db-vm internally over private IP.

Your goal: replicate both VMs to Azure, spin them up, and cut over with minimal downtime.

Step-by-step (applied)

  1. **Assessment** Deploy Azure Migrate collector, discover both VMs, collect performance data, map dependencies (web ↔ db). The assessment report shows web VM underutilized in CPU, db VM disk heavy I/O.
  2. **Prepare Azure** Create a resource group (e.g. RG-WebDB), a virtual network with two subnets (web-subnet, db-subnet), NSGs, routing, connectivity to your on-prem or office.
  3. **Install agents** On web-gcp (Windows), install Mobility agent via the Azure Migrate > replicate wizard. On db-gcp (Ubuntu), install the Linux Mobility agent (via downloaded package).
  4. **Initial replication** The agent copies full disks (C: for web-gcp, / and /var or data volumes for db-gcp) to Azure staging disks. Ongoing incremental replication start.
  5. **Test migration** Use “Test migrate” in Azure Migrate for both VMs. This spin up test-web and test-db in Azure (detached from production). Validate web UI, database connectivity, query performance, etc.
  6. **Cutover** Shut down web-gcp & db-gcp (or quiesce traffic), perform final replication. Initiate cutover in Azure Migrate, assign the proper private IPs, DNS entries, validate communication web → db. Start Azure web VM, Azure db VM, test full app stack.
  7. **Cleanup / optimize** Remove replication agents, delete staging disks, resize disk tiers, enable backup policies, monitor performance. Decommission old GCP VMs when confident.

This template can be expanded to dozens of VMs or more complex topologies.

Tips, Best Practices & Optimization Strategies

  • **Start small** — pick a low-risk VM first as pilot to validate steps.
  • **Batch migrations** by application domain or dependency groups to avoid blast radius.
  • **Monitor replication health** and set alerts on failures, lag, agent disconnects.
  • **Use high-bandwidth links or VPN/ExpressRoute** to speed replication if VMs or disks are large.
  • **Pre-warm target disks** in Azure to avoid cold IOPS latencies post-migration.
  • **Resize disks / VMs after cutover**, don't just copy original size — rightsize based on performance insights. The assessment report helps.
  • **Enable Azure Backup / Azure Site Recovery** post-migration for DR and retention strategies.
  • **Run sanity checks and application tests** after cutover, including dependencies, latency, logs, performance, user-facing functionality.
  • **Document IP / DNS re-mappings** and plan rollback or fallback in case issues arise.
  • **Ensure logging, monitoring, alerting** are enabled in Azure (Azure Monitor, Log Analytics, etc.).

Comparisons & Alternatives (When Azure Migrate Doesn’t Fit)

While Azure Migrate is the recommended tool, there are scenarios where alternate approaches might be needed:

  • **Manual VM import/export** — export GCP VM disk image (as VMDK or raw), upload to Azure Blob, then create VM from image. This gives more control but is more manual and error-prone.
  • **Third-party migration tools** — e.g. CloudEndure (AWS), Zerto, rSync, or commercial migration platforms that support multi-cloud replication.
  • **Rebuild & replatform** — for some workloads, re-deploying fresh VMs or using PaaS services on Azure may make more sense than lifting and shifting entire VMs.
  • **Hybrid or split architecture** — keep some services in GCP while migrating core ones to Azure initially, then gradually migrate rest.

Evaluate based on your environment, risk tolerance, downtime windows, and complexity.

SEO & Discovery Optimization Tips (for Edge News / Google Discover / Bing)

To help this post perform better in Edge News / Discover / Bing, follow these best practices:

  • Use a **clear, descriptive title** with target keywords (e.g. “Migrate VMs from GCP to Azure using Azure Migrate”).
  • Include a concise **meta description** (120-160 chars) summarizing the value (this helps discover card snippet).
  • Use proper headings (H1, H2, H3) with keywords (e.g. “GCP to Azure VM migration”, “Azure Migrate steps”).
  • Include **alt text** for images with keywords (e.g. “GCP VM migration diagram”).
  • Break paragraphs into short, digestible sentences for readability on mobile.
  • Include **internal links** (if you have other relevant posts) and **external authoritative links** (e.g. to Microsoft docs). For example: “See Microsoft’s tutorial: Discover, assess, and migrate GCP VMs to Azure.” :contentReference[oaicite:11]{index=11}
  • Use **structured data / schema markup** if your WordPress theme supports it (e.g. article schema). This helps Bing / Discover show rich cards.
  • Use **lazy loading** for images, and proper **srcset / sizes** attributes for responsiveness (as shown in the image block above).
  • Promote and share on social, tech communities (e.g. Azure, GCP forums) to drive engagement signals.

Final Checklist Before You Hit Migrate

  • Have you taken backups / snapshots of all VMs?
  • Is your assessment report clean (no major blocking issues)?
  • Is Azure environment fully provisioned (network, storage, IAM)?
  • Are replication agents healthy and data syncing?
  • Have you validated test migrations?
  • Are DNS / IP cutover plans documented?
  • Have you allocated time for post-migration validation?
  • Do you have rollback or fallback plans?

Once you’ve verified all of these, you’re ready to execute the migration with confidence.

Conclusion

Migrating virtual machines from GCP to Azure is a complex but manageable process when planned thoughtfully. Using Azure Migrate (with its assessment, replication, cutover, and validation capabilities) gives you a structured, reliable path. The key is to validate early and often, mitigate risks, and keep operations lean.

With this guide, you now have a blueprint to migrate Windows or Linux VMs, manage disk/data replication, handle limitations, and optimize post-migration. You can adapt the steps to your environment, scale to multiple VMs, and refine as you go.

Good luck with your migration — and if you need help in any step (e.g. scripting, diagnostics, rollback strategies), feel free to ask!

Organizations change cloud providers for many reasons: cost, integration with Microsoft stack, compliance, regional availability, or consolidating cloud vendor footprints. Azure offers deep integration with Windows Server, Active Directory, and existing Microsoft licensing — making it an appealing target for many enterprises.

However, migrating VMs is more than copy-paste. Differences in VM types, network architectures, OS adaptation, and disk formats must be managed. That’s where Azure Migrate and Azure’s “Migration and Modernization” hub come in — offering tools for assessment, replication, migration, and validation. :contentReference[oaicite:1]{index=1}

High-level Migration Flow

At a broad level, the migration path is:

In the next sections, we’ll dive deep into each of these phases.

Prerequisites & Prechecks

GCP Side Requirements

Azure Side Requirements

Step-by-Step Migration Process

Below is a detailed, stepwise approach. Use it for both Windows and Linux VMs, adjusting minor differences where needed.

1. Discover & Assess GCP VMs

Before you migrate, you need insight into your GCP VMs — their CPU, memory, disk usage, performance, dependencies, and whether they’re good candidates for Azure. Azure Migrate provides a “Discovery & Assessment” stage. :contentReference[oaicite:5]{index=5}

2. Prepare Target Azure Environment

3. Deploy Replication / Migration Appliance / Agents

To replicate VM data from GCP to Azure, you need either an appliance (in more complex network scenarios) or direct agent-based replication on the VMs. Azure Migrate supports agent-based replication for many VMs. :contentReference[oaicite:7]{index=7}

4. Start Replication of VM Disks / Data

Once agents are in place, begin replication of disks. This has two main phases:

The replication status will show “Initial sync”, “Ongoing replication”, or “Ready for cutover” in the Azure Migrate console.

5. Perform Test Migration / Test Cutover

Before fully switching over, you want to validate that VMs work correctly on Azure:

6. Cutover / Final Migration

To move into production, you run the final migration steps:

7. Post-Migration: Cleanup & Optimization

Differences & Special Cases: Windows vs Linux vs Server OS

Windows VMs

Windows VMs typically require attention to boot drivers, networking adapters, and license compliance:

Linux / Unix VMs (Note: Because of HTML conflicts, GPT autoproduced “”. Replace with `

Linux / Unix VMs

` in your editor.)

Linux VMs have their own nuances:

Legacy / Specialized Server OS (e.g. bespoke, cluster, appliances)

Some server OS or appliance-type VMs may not be directly supported. In such cases:

Handling Data, Disks, and Storage During Migration

One of the trickiest parts of migration is how to move disks, persistent volumes, and data consistency. Here’s what you should know and plan for.

Disk Types & Formats

GCP VMs use **Persistent Disks**, which may be Standard HDD, Standard SSD, or Balanced / PD-SSD. These are presented to the VM at `/dev/disk/by-id/…` or as `/dev/sdX` etc. In Azure, VMs typically use **Managed Disks** (Standard HDD, Standard SSD, Premium SSD, Ultra SSD) or **Unmanaged Disks** in storage accounts.

During replication, the agent captures the logical blocks from the GCP disk and recreates them on Azure managed disks or equivalent. The disk file system (NTFS, ext4, xfs) remains intact unless you convert or re-format.

Incremental / Block-level Replication

Because full copy of large disks is time-consuming, the replication uses **incremental changes** — only the blocks changed since the last sync are transferred. This reduces bandwidth, time, and lag. :contentReference[oaicite:10]{index=10}

Note: If a disk is heavily used, or has hotspots, the initial sync may take long, and catching up changes may lag if network is constrained.

Data Consistency & Quiescing Writes

To ensure consistency:

For certain workloads (e.g. database clusters), you may consider additional steps like snapshotting, replication, or logical replication (e.g. DB-level replication) in parallel with VM migration.

Swap / Resize / Optimize Disks Post-migration

After migration completes:

Limitations, Challenges & Pitfalls to Watch Out For

No migration is perfect — here are known limitations or gotchas you must anticipate.

By being aware of these and doing pilot tests, you can reduce surprises.

Walkthrough: Migration Example (Windows & Linux) from GCP → Azure

Below is a hypothetical but practical migration scenario for both Windows and Linux VMs, tying together the above steps (you’ll want to adapt to your environment). Use this as a reference blueprint.

Scenario: Web + Database VMs

Assume you have two VMs in GCP:

Your goal: replicate both VMs to Azure, spin them up, and cut over with minimal downtime.

Step-by-step (applied)

  1. **Assessment** Deploy Azure Migrate collector, discover both VMs, collect performance data, map dependencies (web ↔ db). The assessment report shows web VM underutilized in CPU, db VM disk heavy I/O.
  2. **Prepare Azure** Create a resource group (e.g. RG-WebDB), a virtual network with two subnets (web-subnet, db-subnet), NSGs, routing, connectivity to your on-prem or office.
  3. **Install agents** On web-gcp (Windows), install Mobility agent via the Azure Migrate > replicate wizard. On db-gcp (Ubuntu), install the Linux Mobility agent (via downloaded package).
  4. **Initial replication** The agent copies full disks (C: for web-gcp, / and /var or data volumes for db-gcp) to Azure staging disks. Ongoing incremental replication start.
  5. **Test migration** Use “Test migrate” in Azure Migrate for both VMs. This spin up test-web and test-db in Azure (detached from production). Validate web UI, database connectivity, query performance, etc.
  6. **Cutover** Shut down web-gcp & db-gcp (or quiesce traffic), perform final replication. Initiate cutover in Azure Migrate, assign the proper private IPs, DNS entries, validate communication web → db. Start Azure web VM, Azure db VM, test full app stack.
  7. **Cleanup / optimize** Remove replication agents, delete staging disks, resize disk tiers, enable backup policies, monitor performance. Decommission old GCP VMs when confident.

This template can be expanded to dozens of VMs or more complex topologies.

Tips, Best Practices & Optimization Strategies

Comparisons & Alternatives (When Azure Migrate Doesn’t Fit)

While Azure Migrate is the recommended tool, there are scenarios where alternate approaches might be needed:

Evaluate based on your environment, risk tolerance, downtime windows, and complexity.

SEO & Discovery Optimization Tips (for Edge News / Google Discover / Bing)

To help this post perform better in Edge News / Discover / Bing, follow these best practices:

Final Checklist Before You Hit Migrate

Once you’ve verified all of these, you’re ready to execute the migration with confidence.

Conclusion

Migrating virtual machines from GCP to Azure is a complex but manageable process when planned thoughtfully. Using Azure Migrate (with its assessment, replication, cutover, and validation capabilities) gives you a structured, reliable path. The key is to validate early and often, mitigate risks, and keep operations lean.

With this guide, you now have a blueprint to migrate Windows or Linux VMs, manage disk/data replication, handle limitations, and optimize post-migration. You can adapt the steps to your environment, scale to multiple VMs, and refine as you go.

Good luck with your migration — and if you need help in any step (e.g. scripting, diagnostics, rollback strategies), feel free to ask!

Leave a Reply

Your email address will not be published. Required fields are marked *